[1]
J. M. Izar Landeta, O. E. Villalón Piña, and J. Ruiz Aguilar, “How variance affects a project’s timeframe and costs”., HITOS, vol. 32, no. 93, pp. 165–182, May 2026, doi: 10.19136/hitos.a32n93.6397.